Shape Copy 2checkchevron-downchevron-leftchevron-rightchevron-thin-downchevron-thin-leftchevron-thin-rightchevron-thin-upchevron-upcancellinkedinlocation2minusplustriangle-right
Home / projecten / Maritime city ship repair Hamriyah Dubai

Maritime city ship repair Hamriyah Dubai

Project Management

IV-Infra designed a shipbuilding and repair facility that spans an area of half a million square meters. Project leader Chris Baggerman headed up the design team and worked in close consultation with the client in Dubai, as well as various contractors and stakeholders.
The project included infrastructure for ship repairers and shipbuilders, associated buildings such as offices, as well as accommodation complexes, commercial retail shops and a maritime technology institute.
Ancillary works included foundation and enabling activities for two ship lifts and on-shore transfer facilities for ships.

Client

Hamriya Maritime City Completion: 2010

Project manager

Chris Baggerman T. 0031-6-19011002

similar projects